Anaheim Logistics
A new logistics facility, carefully fitted to a challenging site.
Summary
Type
Logistics
Office
Location
Anaheim, California
Client
R+L Carriers
size
60,000 square feet
Phase
Construction
Design Problem
A long, narrow site — constrained by a large power line easement — needed to carry the full weight of a trucking logistics facility. Previous design and permitting attempts had stalled, and Red Oak was brought in to solve both.
- 83-door cross-transfer dock.
- 4,000 s.f. offices and driver's facilities.
- 5-bay maintenance facility with office and detailing bay.
- 2-lane fuel station.
Design Approach
Getting the design built required as much persistence as creativity. Red Oak worked closely with city planning, public works, and building departments to navigate a layered permitting process — Conditional Use Permit, environmental review, public utility review, grading permit, building permit, and more — moving forward what previous efforts could not.

Result
Ground broke in the summer of 2025. The project is now under construction.